
Highway 16 – Construction Info
The information below has been provided by the Ministry of Highways. Contact information for the Ministry and project leads is included int heir info sheet, if you have questions please use the numbers they have provided.
A construction project on HWY #16 to add a total of 8 passing lanes is set to begin July 12th, 2021 and weather permitting be completed by June 30, 2022. Please see the below information sheet for more information on potential traffic delays.
Public traffic can expect minor delays and disruptions to their normal travel schedules as traffic will be accommodated through the work one using one way traffic and a reduced speed of 60 km/hr. Flaggers will be present and traffic may be stopped for a period of no longer than 20 minutes. The contractor will provide traffic accommodation.


Water Reduction – Do your part.
Sanitary Sewer Flushing Notice
Please be advised that the Village is flushing sewer mains throughout the community starting today June 24 through tomorrow June 25, to remove grit, sand, gravel and greases from the sewer mains. This is a preventative maintenance operation that helps to prevent sewer blockages, odour generation and premature wear on mechanical components.
This work will not affect the majority of property owners or cause disruption to service although there is a possibility that small spills, noise and odours may result in some homes. Here’s why: the sewer cleaning process uses a high pressure water jet to scour the pipe clean. When the water jet passes through the sewer main, the water pressure draws air through the pipes. The air movement has the ability to push out, or pull in the water and air held inside your plumbing and U-shaped traps and this includes your toilets, showers, sinks and floor drains.
We realize that the equipment can be noisy and may disturb residents. Sometimes this cannot be avoided and we appreciate your patience. We also appreciate your patience as some areas of some streets may be blocked by the equipment for short periods of time.
There are preventative measures you can take in your home. For more information read the full article below.
2020 Water and Sewer Works Financial Overview
This information on the Village of Viscount Waterworks & Sewage Works is being provided as required under The Municipalities Regulations.
Public Notice
Notification is sent to the public regarding the availability of the Annual Waterworks Financial Overview with the July water bills.
The following additional information on the Village Waterworks is available at the Municipal Office and on the Village Website:
- The 2021 Waterworks Rate Policy (contains Capital Investment Strategy).
- Ten-Year Capital Plan in place and related sources of funding for the projects
- 2020 Financial Overview of the waterworks
- Waterworks reserves/investments policy and information
- Most recent copy of the waterworks assessment (from 2015)
- Annual Drinking water quality and compliance report (2020)

